The association of those affected by the power line in the Lecrin Valley "The Coordinator" contacted Smart Reeds to prepare a report on the possible adverse effects that these facilities may have on citizens, contemplating the levels of #electricfields, #magneticfields, #environmentalnoise and #vibrations.
The project led by REE consists of a #highvoltage line of 220 KV, and 124 km, as well as the construction of a new substation.
This report is incorporated into an extensive document of multidisciplinary #allegations that will be presented at the Junta de Andalucía through the affected municipalities.
#smartreeds #camposmagneticos #camposelectricos #medioambiente #radiation #sustainability #climatechange #urbanresilience #smartreedsexperience #preparingcitiesforthefuture